1. On-Site Consultation & Quote: Laser-precision measurements, slope checks, and an itemized proposal.
2. Utility Locates & Permits: We coordinate Ontario One Call and Hamilton permit paperwork for you.
3. Excavation & Base Build-Out: Remove existing material to approximately 300 mm; install and laser-grade 200–225 mm Granular-A.
4. Compaction & Proof-Roll: Twin-drum rollers achieve 98% Proctor density; proof-roll verifies stable support.
5. Hot-Mix Placement: HL-3A asphalt arrives at approximately 160 °C and is machine-laid in a seamless pass; crews hand-trim edges.
6. Finish Roll & Edge Seal: Final steel roll yields a uniform mat; edge seal prevents ravel and weed intrusion.
7. Clean-Up, Walk-Through & Warranty: We clear the site, review the work with you, and hand over your care guide.